Edison Road Extension

Project Owner: City of Maricopa
Project Type: Construction Manager at Risk
Construction Dates: 08/16 to 04/17

The project consisted of a new alignment extending Edison Road as a four-lane arterial roadway including curb & gutter, sidewalk, medians, and landscaping beginning at Roosevelt Avenue and continuing to the west and north along the alignment of City owned property. The alignment continues north along the developer owned parcels to State Route 238 (Mobile Road) and includes a new two-lane arterial roadway with landscaped medians. A new box culvert was constructed at the west end of the project and a bank of 12 thirty-inch RGRCP pipes installed on the north end to manage regional flood water through the newly constructed roadway alignment. On the north end of the alignment, improvements were made to State Route 238 creating right-turn and left-turn movements onto Edison Road. On the south side of the alignment, a new connector street called Garvey Connection was built to connect Garvey Avenue to Edison Road. The project included the installation of water and sewer services, dry utility duct bank including joint use trench with gas, and coordination with adjacent development and capital projects. A scope addition was included to provide infrastructure and a pad to support the installation of a temporary Fire Administration facility. Other elements of the project include: new street lighting, water and sewer stubs to future developments, on-street parking along Garvey Connection, and streetscape elements. Total quantities included 30,300 SY of pavement and 9,589 LF of wet utilities.

Facebook-Logo Achen-Gardner Construction Check out our Facebook page for more photos Gilbert Road Improvements Project CHECK OUT OUR FACEBOOK PAGE FOR MORE PHOTOS    10-10-16  10-18-16  04-06-17

Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa

Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa 

Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa

Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa

Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa


Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa

Achen-Gardner Construction heavy civil general contractor wet utility roadway highway infrastructure improvements Arizona New Mexico Colorado UV CIPP rehabilitation reline america Edison Road Extension Construction Manager at Risk City of Maricopa