| Ocotillo Pipelines (South Chandler Wastewater Force Main OWRF to AWRF and Water Transmission Main) Project Owner: City of Chandler This CM@R project included the construction of both a 42-inch diameter HDPE wastewater force main pipeline and a 24-inch diameter DIP water main. Both pipelines are approximately six miles in length extending along the Ocotillo Road alignment in Chandler, AZ. The wastewater force main ties into the new lift station at Chandler’s Ocotillo Water Reclamation Facility near Queen Creek Rd. and Dobson Rd. and extend along Ocotillo Rd. to the Airport Water Reclamation Facility west of McQueen Rd. The water main ties into a water line near Intel at Dobson Rd. and Ocotillo Rd. and extends along Ocotillo Rd. to McQueen Rd. The project includes installation of manholes, valves, and seven jack & bore crossings at utility-congested intersections as well as the Union Pacific Railroad crossing and Consolidated Canal crossing. Ocotillo Pipelines - PUBLIC OUTREACH WEBSITE
|
||||||||||||||||||