Basha Road Improvements
Project Owner: City of Chandler
Project Type: Design-Build
Construction Dates: 03/06 to 07/06
The Basha Road Improvements project was a 1-Step Design-Build that improved Basha Road (Ocotillo Road to Alma School Road) and included pedestrian, bike, and traffic control enhancements associated with improvements adjacent to the Basha Museum and Snedigar Park. Design scope required extensive ROW acquisition and utility coordination.