Cooper Road/Pecos road improvements

Project Owner: City of Chandler
Project Type: Construction Manager at Risk
Construction Dates: 10/06 to 10/08

This project consisted of roadway and utility improvements to Cooper Road (Consolidated Canal to Loop 202 San Tan Freeway) and Pecos Road (McQueen Road to Emmett Drive). The 2.75 miles of improvements included a new six-lane section with a median, curb and gutter, sidewalk, traffic signals, left and right turn bays, bus pullouts, streetlights, and landscaping. We completed 8,400 LF of reclaimed water line, 7,200 LF of potable water line, 2,600 LF SRP pipe and irrigation. There were also utility relocations and we widened SRP Consolidated Canal bridge at two locations (Pecos Road and Cooper Road).