Silverstone improvements
Project Owner: Silverstone Development LLC
Project Type: Construction Manager at Risk
Construction Dates: 12/10 to 05/11
Work on the Silverstone Development, located in North Scottsdale, consisted of widening Williams Drive, Miller Road and Pinnacle Peak Road, and building two new roads - 74th Street from Williams Drive to Pinnacle Peak and Silverstone Drive from Scottsdale Road to 74th Street. The project included waterline, sewer line, storm drain (pipe, manholes, catch basins, scuppers, drainage channels, and construction of a triple box culvert at Pinnacle Peak Road), asphalt paving, curb, sidewalk, sidewalk ramps, pavement marking and signs, street lighting, APS duct bank with Cox, Qwest, and Southwest Gas joint trench, lowering of trans-continental Qwest fiber-line, traffic signals, landscaping, tree salvaging and re-planting, flood wall, and a new roundabout at Silverstone Drive and 74th Street.