MARABELLA RANCH INFRASTRUCTURE EXTENSION

Project Owner: Liberty Utilities
Project Type: Design-Bid-Build
Construction Dates: 12/16 to 05/17

This project included the installation of 4,057 LF of 12” water main under El Mirage Road from Maryland Avenue to Glendale Avenue. The project was inside of MCDOT and City of Glendale right-of-way. In addition to installing the pipe, Achen-Gardner Construction encased 124’ of sanitary sewer crossing in the El Mirage Road and Glendale Avenue intersection.