Greenway and I-17 water line relocation
Project Owner: City of Phoenix
Project Type: Construction Manager at Risk
Construction Dates: 05/20 to 06/20
We worked at the I-17 and Greenway Road to facilitate the installation of a new storm drain. We excavated and backfilled four future ADOT storm drain crossings over an existing 48” City of Phoenix transmission main. Two of the locations included the replacement of asphalt paving and two included concrete replacement.