Water Utility Pipeline and Infrastructure  

Project Owner: City of Buckeye
Project Type: Job Order Contracting
Construction Dates: 08/19 to 08/24

This wet infrastructure JOC includes water, sewer, reclaimed water, and storm drain pipeline construction.

JO#1: We installed more than 6,400 LF of 16” DIP water line adjacent to Hopeville community near the Buckeye Municipal Airport. This also included three hydrants and 13 valves.

JO#2: We installed more than 1,300 LF of 16” DIP and 1,200 LF of 12” DIP water line on the Buckeye Municipal Airport property. We also installed five hydrants and six valves.