Val Vista Transmission Main Priority 4 CMAR
Project Owner: City of Phoenix
Project Type: CMAR
Construction Dates: 11/22 to 01/23
Achen-Gardner crews rehabilitated 3,920 LF of a 96” diameter pipeline that is critical to the City’s water supply. Achen-Gardner’s team slipline rehabilitated this pipeline by installing a new 92” diameter welded steel liner from a single access portal located within City of Mesa right of way. The project needed to be completed within a two-month shutdown of the pipeline which was planned years in advance.