Main Street Wastewater Main Replacement
Project Owner: Town of Florence
Project Type: Job Order Contracting
Construction Dates: 04/24 to 07/25
We recently made improvements to the existing Town of Florence sewer line. We installed more than 3,600 LF of sewer utilizing pipe bursting, a trenchless method of installation. The existing clay pipe was 6” and we installed a 8” HDPE pipe in the same alignment. This project also includes the installation of 11 manholes and approximately 24 services.
The work is taking place completely with in ADOT right of way so, we have had to coordinate with both ADOT and the Town of Florence. We are working with residents and stakeholders to maintain safety and access during construction.
Achen-Gardner Construction is proud to be one of the few contractors in Arizona to utilize pipe bursting to install new pipe. We recently completed similar work on the City of Avondale’s Sewer Repair and Design Services CMAR project.